Skip to content

DEV-1358: MATLAB update PR asks for a hardware check and says merging releases - #340

Merged
JongChern merged 1 commit into
masterfrom
DEV-1358_matlab_release_note
Oct 28, 2026
Merged

JongChern merged 1 commit into
masterfrom
DEV-1358_matlab_release_note

Conversation

@JongChern

Copy link
Copy Markdown
Contributor

The update-matlab job opens an "Update ShimmerJavaClass.jar" PR in Shimmer-MATLAB-ID. That PR's text now adds two things, as LabVIEW's update PR does for its VIs:

  • Before merging, run an example such as plotandwriteexample.m on a Shimmer3 and a Shimmer3R. MATLAB cannot run in CI.
  • Merging publishes a MATLAB API release: the next patch version, with the Java API version in its title.

The how-to-release steps at the top of release.yml, the release job's step summary and AGENTS.md now say the same.

Depends on ShimmerResearch/Shimmer-MATLAB-ID#21, which adds the release workflow there. Merge that first, or the new PR text describes a release that doesn't happen yet.

Tested: the YAML parses. I ran the update-matlab script locally with gh and git stubbed, and the PR body renders as:

Replaces libs/ShimmerJavaClass.jar with the build from API_v0.11.12_beta (abc123), compiled as Java 8 bytecode with gradlew shadowJar -PmatlabJava8.

  • Before merging, run an example such as plotandwriteexample.m on a Shimmer3 and a Shimmer3R. MATLAB cannot run in CI.
  • Merging publishes a MATLAB API release: the next patch version, with Java API 0.11.12_beta in its title.

Opened by the Release Java API run.

The workflow's own dry run on this PR covers build and matlab-jar. update-matlab runs only on a real release.

🤖 Generated with Claude Code

The update-matlab job's PR now asks for a MATLAB example to be run on
a Shimmer3 and a Shimmer3R before merging, and says that merging
publishes a MATLAB API release (Shimmer-MATLAB-ID's new release.yml).
The how-to-release steps in release.yml, its step summary and
AGENTS.md say the same.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
@JongChern
JongChern merged commit 97acd19 into master Oct 28, 2026
7 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant