Tracker housekeeping after PR #70 (Step 1.9 — CDC connectors) merged.

Same pattern as PRs #49, #53, #58, #61, #63, #65, #67, #69.

Documentation

Test plan

  • No code touched; lint/test status is identical to `main`.

🤖 Generated with Claude Code

- Flip Step 1.9 (CDC connectors) from ⏳ to ✅; capture full deliverable
  (3 CDC connectors + DedupFilter, Document.fingerprint property,
  35 tests, docs).
- Phase 1 progress: 14/16 → 15/16 done (1 remaining — Step 1.10, the
  CLI demo milestone).
- Total: 27/84 → 28/84 done
- Tighten Next-action prose (drop stale "1.9 deferred" parenthetical
  that survived from the pre-Step-1.9 amend cycle).
- Add PRs #69 (Step 1.8 tracker sync) and #70 (Step 1.9) to history.

Co-Authored-By: Claude Opus 4.7 (1M context) <[email protected]>
@officialCodeWork
officialCodeWork merged commit 97692c9 into main May 25, 2026
9 checks passed
officialCodeWork added a commit that referenced this pull request May 25, 2026
chore(tracker): mark Phase 1 complete (Step 1.10 → ✅; log PRs #71, #72)
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant