Skip to content

chore(time): record project foundations time - #30

Closed
btraintinger wants to merge 6 commits into
mainfrom
chore/29/time-tracking
Closed

btraintinger wants to merge 6 commits into
mainfrom
chore/29/time-tracking

Conversation

@btraintinger

Copy link
Copy Markdown
Owner

Summary

Record six time entries totaling 43h30m for project class attendance, presentation preparation, specification work, and implementation research and prototyping. Each commit retains its issue references and time entry; the generated time report now totals 44h16m including the existing 46m.

Supplied work dates are recorded in commit bodies. Entries without supplied dates omit the work date.

Related issue

Refs #29
Refs #2
Refs #3
Refs #6
Refs #7

Validation

  • Independent verification of all six entries and the generated report passed.
  • pnpm typecheck passed.
  • pnpm test passed: 43 tests across 4 files.

Merge using Rebase and merge to preserve individual time entries.

…e: 1h45m

Work date: 2026-10-05.
Attended in-person project class.
…e: 1h45m

Work date: 2026-10-09.
Attended in-person project class.
…| time: 4h

Work date: 2026-10-08.
Created a PowerPoint presentation as a team for project class.
…e: 1h

Work date: 2026-10-05.
Discussed the specification with the project partner.
…: 5h

Defined the specification as a team.
… refs #29 | time: 30h

Researched possible implementation options and carried out explorative prototyping.
@btraintinger
btraintinger deleted the chore/29/time-tracking branch November 20, 2026 10:58
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant