Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
2 changes: 1 addition & 1 deletion src/pages/trust.html
Original file line number Diff line number Diff line change
Expand Up @@ -181,7 +181,7 @@ <h3 class="text-lg font-semibold text-brand-dark flex items-center gap-2"><i cla
<li class="flex items-start gap-2.5"><i class="ph-bold ph-arrow-right text-brand-orange mt-1"></i>Continuous control monitoring</li>
<li class="flex items-start gap-2.5"><i class="ph-bold ph-arrow-right text-brand-orange mt-1"></i>SOC 2 Type II observation window and independent audit</li>
</ul>
<!-- TODO(@ray): if you want a public target date for the Type II window, insert it here (e.g. "Targeted for H2 2026"). Left out deliberately so we never publish a date we cannot stand behind. -->
<p class="mt-5 text-sm text-text-secondary"><span class="text-brand-dark font-medium">Planning target: H2 2027 for the SOC 2 Type II examination.</span> Timing depends on control readiness, the observation window, and the independent auditor's schedule. This is a planning target, not a claim of certification.</p>
<p class="mt-5 text-sm text-text-secondary">Pursuing a compliance review and need our current status or security documentation? <a href="#disclosure" class="text-brand-orange hover:underline">Get in touch</a> and we will share where things stand.</p>
</div>
</div>
Expand Down
2 changes: 1 addition & 1 deletion trust.html
Original file line number Diff line number Diff line change
Expand Up @@ -312,7 +312,7 @@ <h3 class="text-lg font-semibold text-brand-dark flex items-center gap-2"><i cla
<li class="flex items-start gap-2.5"><i class="ph-bold ph-arrow-right text-brand-orange mt-1"></i>Continuous control monitoring</li>
<li class="flex items-start gap-2.5"><i class="ph-bold ph-arrow-right text-brand-orange mt-1"></i>SOC 2 Type II observation window and independent audit</li>
</ul>
<!-- TODO(@ray): if you want a public target date for the Type II window, insert it here (e.g. "Targeted for H2 2026"). Left out deliberately so we never publish a date we cannot stand behind. -->
<p class="mt-5 text-sm text-text-secondary"><span class="text-brand-dark font-medium">Planning target: H2 2027 for the SOC 2 Type II examination.</span> Timing depends on control readiness, the observation window, and the independent auditor's schedule. This is a planning target, not a claim of certification.</p>
<p class="mt-5 text-sm text-text-secondary">Pursuing a compliance review and need our current status or security documentation? <a href="#disclosure" class="text-brand-orange hover:underline">Get in touch</a> and we will share where things stand.</p>
</div>
</div>
Expand Down
Loading