Skip to content

About

AI risk register that returns loss exposure ranges instead of heat-map colours. Twelve seeded scenarios through a 10,000-iteration Monte Carlo.

Resources

Stars

0 stars

Watchers

0 watching

Forks

Latest commit

 

History

5 Commits

Folders and files

Repository files navigation

Quantified AI Risk Register

An AI risk register that produces loss exposure ranges instead of heat-map colours — while still showing coverage against NIST AI RMF 1.0 and ISO/IEC 42001 Annex A.

Live: https://rootcawsllc.github.io/ai-risk-register/ — when to use it, how to use it, and how to take the pattern into an organisation.

The register on the risk-lab shell. A full-width introduction under the lab kicker, then a scenario library of twelve toggles with four risks in the register, each with its trustworthiness and framework tags, three-point frequency and loss fields, and its expected, median and bad-year figures. Beneath: the aggregate exposure banner at the mean, P50, P90 and P99, the provenance panel explaining that every range is a seeded estimate, framework coverage bars for NIST AI RMF and ISO 42001, the Markdown export, and three closing notes in cards

This panel is the reason to look at this tool rather than the loss figures above it. A register that produces dollar ranges owes you an account of where the ranges came from, and here the honest answer is that they are seeded — checked against the real corpus on every load, so the claim fails visibly rather than quietly if that ever stops being true.

Why this exists

NIST AI RMF 1.0 and ISO/IEC 42001 are good at what they are for. They tell you which questions an AI programme should be able to answer, and they give you a vocabulary an auditor recognises.

What neither does — because neither is trying to — is tell you how much AI risk you are actually carrying. So most AI risk registers end up as a list of scenarios with a colour beside each one. Red is not a unit of measurement. You cannot add two reds, you cannot compare a red to a control budget, and you cannot walk a CFO through one.

This register keeps the framework mapping, because you do need to show coverage. It just scores every risk the way any other risk should be scored.

What it does

Twelve seeded AI risk scenarios — prompt injection driving an unauthorised action, training data poisoning, sensitive data leaving for a third-party provider, model inversion, confabulation inside a customer-facing decision path, harmful bias in an eligibility decision, silent model drift, agentic action without human approval, third-party model deprecation, shadow AI, IP exposure from generated output, and inability to explain an adverse automated decision.

Each carries a trustworthiness characteristic and a pre-built mapping to the AI RMF categories and ISO 42001 Annex A groups it bears on. Add or remove them to shape the register.

Three-point estimates, not a matrix. Every risk takes a frequency range (events per year) and a loss magnitude range (dollars per event). A 10,000-iteration Monte Carlo — triangular sampling for magnitude, Poisson for event counts — produces an annual loss distribution per risk and, summed across the register on every iteration, an aggregate portfolio distribution reported at the mean, P50, P90, and P99.

Coverage that stays honest. The framework panel shows which of the nineteen AI RMF categories and nine Annex A groups the register touches, and which it does not. Coverage means a risk maps to that category — not that the category is satisfied. That is a control question, and a register cannot answer it.

Markdown export of the whole register, the aggregate statistics, and the coverage gaps.

The distribution matters more than the mean

With a rare, high-impact risk in isolation — model inversion, seeded at 0.02–0.15–0.8 events per year — roughly 73% of simulated years see no loss event at all. The expected value is being carried entirely by the years that are not quiet. Reporting only a mean hides that completely, which is why the tool reports the P90 and P99 next to it and says so in the panel.

Honest limits

The seeded ranges are illustrative and they are the weakest part of the model. Frequency and magnitude for AI-specific loss events are not well established — the incident base is thin and mostly unpublished. Replace them with your own calibrated estimates before the output means anything about your organisation. The tool is a structure for your numbers, not a source of them.

No scenario here is offered a benchmark, and that is a finding rather than a shortcut. The other tools in this set can start from a source-backed shard; this one deliberately cannot. The register models first-party AI system risk — injection, poisoning, inversion, confabulation, drift, agentic action without approval. The sourced corpus at risk-benchmarks contains exactly one AI-related shard, deepfake-enabled fraud, which is an attacker using AI against you through social engineering: an adjacent but different threat class, with all six of its parameters at low confidence. Anchoring prompt injection to it would produce a citation without producing a measurement, which is worse than an openly seeded number. The tool checks the corpus on load and says what it finds, so if a first-party AI shard ever qualifies, this claim stops being true visibly rather than silently.

A scenario here becomes source-backed when a public dataset reports per-incident loss for that failure mode, on a stated population, with enough events to support a range rather than an anecdote. Incident counts are not enough. A single headline settlement is not enough.

Mapping is at category and Annex A group level. AI RMF subcategories and individual Annex A controls are deliberately not claimed, because a scenario-level register cannot honestly assert that granularity.

Coverage and exposure answer different questions. Coverage tells an auditor the programme is complete. Exposure tells a board whether it is worth what it costs. You need both, and neither substitutes for the other.

Running locally

Single self-contained index.html — React 18 via UMD CDN, no build step, no dependencies.

python -m http.server 8000

Then open http://localhost:8000. Nothing you enter leaves the browser — no backend, no storage, no telemetry. The page does fetch React, the webfonts, and the benchmarks corpus it checks its own provenance claim against; none of those requests carries anything you entered, and if the corpus is unreachable the panel says so and the register is otherwise unaffected.

Related

Attribution

Category and control names are from NIST AI RMF 1.0 and ISO/IEC 42001:2023, used for mapping reference only. This project reproduces neither standard.

License

Copyright (c) 2026 RootCaws LLC.

GNU AGPL v3 or later. If you modify this and run it as a network service, the AGPL requires you to offer your users the modified source under the same terms.

About

AI risk register that returns loss exposure ranges instead of heat-map colours. Twelve seeded scenarios through a 10,000-iteration Monte Carlo.

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages