Skip to content

skill-quality / semantic-skill-quality times out at its 10-minute limit (≈40% of runs cancelled, incl. main) #5228

Open

Description

@EHotwagner

Parent Outcome: #5097
Work level: Delivery · Track: Active delivery · Intended Status: Ready

Owner

Root/fdev assigns.

Done when

semantic-skill-quality (skill-quality.yml, timeout-minutes: 10) stops being cancelled on its timeout.

This is a process finding reported by the GAME-RENDER-02.1 owner (#5221) and the ALGO-01.1 owner (#5227).

Current deliverable

Source preparation on routine/5228-semantic-gate-runtime; no PR yet.

Next action

Assigned gate_5228 owner measures semantic rejection-step cost and prepares a bounded optimization; Root admits a PR when integration capacity frees.

Blocked on

Nothing.

Acceptance evidence

Original cancelled run and measured phase timing: #5228 (comment) . Ten successful runs and required-status disposition remain unfulfilled.

Refs #5182

Activity

  1. EHotwagner commented on Nov 2, 2026

    @EHotwagner
    ContributorAuthor

    Root recovery finding, 2026-11-02: the inherited PR #5244 rerun also ended cancelled, run https://github.com/FS-GG/.github/actions/runs/41409628030 . Native job timestamps: 08:14:26–08:24:41 UTC; setup finished 08:14:47; compiled contracts/process checks finished 08:16:25; semantic quality/rejection-path step ran 08:16:25–08:24:39 and was cancelled. This adds a measured affected run to the existing finding, not a new issue or an accepted check. Root keeps #5244 draft, owns resolving this shared gate before claiming its handoff ready condition, and will reconsider implementation when the current .github PR integration capacity frees. No unchanged rerun dispatched.

  2. EHotwagner commented on Nov 2, 2026

    @EHotwagner
    ContributorAuthor
    No description provided.
  3. EHotwagner commented on Nov 2, 2026

    @EHotwagner
    ContributorAuthor

    Root coordination update, 2026-11-02: the existing reviewed two-file optimization at e85d319df9784ada03f184c3bd78e06714f95177 is being composed into the same Core upgrade PR #5255 by its existing owner algo_deps37. This avoids a competing source PR for the same actual bottleneck. The original optimization owner/review evidence remains retained.

    Actual original Core skill-quality run41457678933/job125318448487 exceeded its existing ten-minute limit. The retained job annotation identifies the timeout; no manual cancellation or superseding run was established. The board-mutant harness consumed323.711 seconds before later prerequisite controls continued to the deadline. Root authorized this causal repair: fail fast only after a mutant is detected, preserving the full unmutated baseline, surviving-mutant suites, all73 mutants and all60 rejection controls. No deadline or coverage relaxation is authorized. The assembled modified fixture and independent delta review are required before the next admitted hosted window.

    This is source composition, not acceptance of this Delivery. Its full ten-consecutive-hosted-success/timing/status acceptance remains open. Native source integration, each original failed/cancelled attempt and the existing parent scope remain distinct.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions