Milestones
List view
Not tied to a release: good first issues, documentation, UX follow-ups, CI flakes and packaging. Picked up whenever there is room; moved into a release milestone once someone takes one.
No due date•6/16 issues closedRestart the Wasserförderung module in slices: the FI 5.008 planner engine, the tab with persistence, sync and PDF, the Einsatzauftrag per pump, the map mode salvaged from #164, and the execution mode in the field. It adds tables to the .fwincident schema, so it lands before the 1.0 freeze.
No due date•0/7 issues closedThe feature wishes from the field: Sicherheitstrupp, Dekon-Platz, freely named gases, predefined Häuser and Einsatzpläne, a full address model. Each of them changes the .fwincident schema, so they land before the 1.0 freeze, not after it.
No due date•47/47 issues closedFreeze the .fwincident schema and commit to forward migration. After this a file written today stays readable.
No due date•0/1 issues closedDecide and apply the localization approach so the UI is translatable, and finish the layering split so AppLogic no longer reaches into infrastructure. The portability review lands here too: every place the app names a Bavarian concept — ILS, the AGW ppm bands, EG/OG/UG, the A4 German report — waits on the same decision.
No due date•0/14 issues closed