Skip to content

plan: [AF-CTR-04] Scope: the prerequisites of the first gated operation move to AF-CTR-05 - #80

Merged
deku2026 merged 1 commit into
mainfrom
plan/af-ctr-04-scope2
Nov 5, 2026
Merged

deku2026 merged 1 commit into
mainfrom
plan/af-ctr-04-scope2

Conversation

@deku2026

@deku2026 deku2026 commented Nov 5, 2026

Copy link
Copy Markdown
Contributor

Summary

The second scope Plan PR of AF-CTR-04 (before CM). Per e1a-decisions.md OQ-1 (ii): no AF-CTR-04 operation is gated (no access or page row carries a Feature; center.nodes maps to AF-CTR-05's node connection), so the part-B prerequisites bullet moves from AF-CTR-04 to AF-CTR-05.

  • delivery-graph.json: AF-CTR-04 scope[9] ("Before the first gated operation ...") is removed; AF-CTR-05 gains it in scope, after the node hub bullet, worded "Before AF-CTR-05's first gated operation (the node connection, center.nodes; ...)". Every item and the Cloud source reference are kept.
  • ledger/ledger.jsonl: one note entry for AF-CTR-04 (execution-policy 1.6), added with tools/plan.py ledger.
  • sequence.md: regenerated with tools/plan.py sequence; no change.
  • AF-CTR-04 stays active; nothing else changes.

Validation

  • python tools/plan.py validate --design <Design origin/main 7466181>: 0 errors, 63 tasks.
  • check_design.py --plan delivery-graph.json: 0 errors.
  • python -m unittest discover -s tests: 48 tests OK.
  • Linux leg: see the LEG PASS line quoted by the coordinator.

🤖 Generated with Claude Code

https://claude.ai/code/session_01H6Cf6kHnz1ZkfURhVWvGjP

…on move to AF-CTR-05

e1a-decisions OQ-1 (ii): no AF-CTR-04 operation is gated, so the part-B prerequisites scope bullet moves from AF-CTR-04 to AF-CTR-05 (before its first gated operation, the node connection). AF-CTR-04 stays active. Ledger note under execution-policy 1.6.

Co-Authored-By: Claude Sonnet 5.5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01H6Cf6kHnz1ZkfURhVWvGjP
@deku2026

deku2026 commented Nov 5, 2026

Copy link
Copy Markdown
Contributor Author

Review record: Plan #80 (second AF-CTR-04 scope PR)

Result: APPROVE at beb0fe0 (coordinator review; a two-file scope move).

  • Implements the recorded decision e1a-decisions OQ-1 (ii): no AF-CTR-04 operation carries a Feature, and the first gated operation is AF-CTR-05's node connection (center.nodes), so AF-CTR-04's bullet "Before the first gated operation (store-1 and the snapshot clock floor, gate-3, gate-2, a per-account resource control in front of every gated row, every Feature row checked against feature.OperationKeys)" moves to AF-CTR-05's scope, every item and the Cloud source reference kept. AF-CTR-04 stays active.
  • One ledger note via tools/plan.py ledger (e1a OQ-1, execution-policy 1.6); sequence.md regenerated by the tool, unchanged.
  • Validation with a fresh ArcForges-Design checkout at origin/main 7466181: plan.py validate --design 0 errors (63 tasks, 17 milestones); check_design.py 0 errors; unit tests 48 OK.
  • Host statuses at beb0fe0: arcforges/linux success; arcforges/windows success.

Generated by Claude Code

@deku2026
deku2026 merged commit 99b7bc6 into main Nov 5, 2026
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant