Skip to content

Latest commit

 

History

History
23 lines (16 loc) · 1.08 KB

File metadata and controls

23 lines (16 loc) · 1.08 KB

RFCs

People put this tool in their build and asset pipelines, so some changes break them. A pull request that changes the TIM files it writes, the image files it accepts, or removes a feature, gets the rfc label and cannot merge for seven days, so the people who depend on it can comment first.

Bugfixes that make the output match what the tool already promises, UI changes that leave the output alone, and new features do not need one. Who opens the pull request makes no difference.

The window

While the label is on, the rfc-moratorium check fails until seven days after the label was last applied, and main requires that check. The check's description gives the time the window closes. If the proposal changes during the window, remove and re-apply the label and say what changed in a comment; the seven days start over.

Open RFCs are the open pull requests with the label.

Commenting

Comment on the pull request. An objection helps most with a use case attached: what you do today that the change would break.