Skip to content

Latest commit

 

History

History
59 lines (44 loc) · 2.6 KB

README.md

File metadata and controls

59 lines (44 loc) · 2.6 KB

Documentation

This directory contains the compiled documentation for the Holy Angel University Clinic Records Management System. All official letters, database schemas, architectural diagrams, and project reference materials are uploaded and maintained here.

Contents

Folder What is in it
interview/ Interview questions, raw transcriptions and photos from the clinic visit
requirements/ Functional and non-functional requirements
diagrams/ Level 0 context diagram, Level 1 data flow diagram, use case diagram and site context diagram
site-context/ Site justification, system analysis and design potential
letters/ Clinic support letter
presentation/ Pitch presentation for the University Clinic, and the video presentation with its script

Software Engineering Final Project Checklist

This checklist is based on the Project Evaluation Rubric (70 points).
Use it to track progress across all phases of the project.
To add check on the checkboxes, just simply add an x inside while editing this README file.


Project Narrative

  • Project Title – Creative / Engaging Title (Working Title: HAU-Sync: Patient Record Management and Appointment System for Holy Angel University Clinic)
  • Background – Well-written abstract & project description, no errors, complete coverage

Design

  • Design Concept – Creative, innovative, coherent
  • Site Context – Justification, system analysis, design potential
  • Design Layout – Organized, complete, legible, follows standards, includes visuals/maps
  • Functional Requirements – Define product features & functions
  • Non-Functional Requirements – Define system quality attributes
  • Software Analysis Development Tool
    • Level 0 Diagram – High-level overview, external entities, easily understood
    • Level 1 Diagram – Detailed breakout of subprocesses
  • Software Model
    • Use-Case Diagram – Actors & interactions
  • Process Development Model (choose one)
    • Waterfall
    • Agile
    • Spiral
    • Incremental / Iterative
  • Implementation – Feasibility, financial viability, support & maintenance

Prerequisites

  • Clinic Support letter – formal letter to be submitted to University Clinic for acknowledgement
  • Interview Questions – Open ended questions that will be asked during the interview

Documentations deadline: September 29, 2026