| allowed-tools | Read, Write, Edit, Glob, Grep, MultiEdit | |
|---|---|---|
| description | Creates a concise engineering implementation plan based on user requirements and saves it to specs directory | |
| argument-hint |
|
Create a detailed implementation plan based on the user's requirements provided through the USER_PROMPT variable. Analyze the request, think through the implementation approach, and save a comprehensive specification document to PLAN_OUTPUT_DIRECTORY/<name-of-plan>.md that can be used as a blueprint for actual development work.
USER_PROMPT: $ARGUMENTS
PLAN_OUTPUT_DIRECTORY: specs/
- Carefully analyze the user's requirements provided in the USER_PROMPT variable
- Think deeply (ultrathink) about the best approach to implement the requested functionality or solve the problem
- Create a concise implementation plan that includes:
- Clear problem statement and objectives
- Technical approach and architecture decisions
- Step-by-step implementation guide
- Potential challenges and solutions
- Testing strategy
- Success criteria
- Generate a descriptive, kebab-case filename based on the main topic of the plan
- Save the complete implementation plan to
PLAN_OUTPUT_DIRECTORY/<descriptive-name>.md - Ensure the plan is detailed enough that another developer could follow it to implement the solution
- Include code examples or pseudo-code where appropriate to clarify complex concepts
- Consider edge cases, error handling, and scalability concerns
- Structure the document with clear sections and proper markdown formatting
- Analyze Requirements - THINK HARD and parse the USER_PROMPT to understand the core problem and desired outcome
- Design Solution - Develop technical approach including architecture decisions and implementation strategy
- Document Plan - Structure a comprehensive markdown document with problem statement, implementation steps, and testing approach
- Generate Filename - Create a descriptive kebab-case filename based on the plan's main topic
- Save & Report - Write the plan to
PLAN_OUTPUT_DIRECTORY/<filename>.mdand provide a summary of key components
After creating and saving the implementation plan, provide a concise report with the following format:
✅ Implementation Plan Created
File: PLAN_OUTPUT_DIRECTORY/<filename>.md
Topic: <brief description of what the plan covers>
Key Components:
- <main component 1>
- <main component 2>
- <main component 3>