Skip to content

New peak error metrics #7

Description

@praftery

Include an error metric that looks at the peak month prediction. Utility bills for large buildings often charge based an overall $/kWh consumed (which we cover well with existing error metrics) as well as a $ per peak kW consumption in a month. These peak demands often make up half the total cost.

As yet, none of the error metrics evaluate model accuracy for this - and it can have a very significant impact on the end result.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions